CO2 Gas Recovery Plant

CO2 Gas Recovery Plant
Product Introduction:
Capacity: 300~15000Nm3/H
Carbon dioxide storage temperature: -20~-25°C
Storage pressure: 2.0MPa.G
Water content: <20ppm
H2S content: <0.1ppm
Power consumption: 0.3~0.34kw.h/Nm3(CO2)
Send Inquiry
Description
Technical Parameters

NEWTEKCO2 Gas Recovery Plant uses combustion, washing and other processes, adapts to diesel, natural gas and other fuels, and accurately recovers carbon dioxide. Centralized control is adopted to ensure the safety and stability of the system; convenient transportation and easy installation.
 

Details Features
 

1.Energy saving and consumption: high-efficiency and environmentally friendly refrigerants are selected, and the overall energy consumption is low.

2.Easy to install: The food-grade CO2 production device adopts a skid-mounted modular design, which is easy to install.


3.Sturdy and durable: equipped with mature screw compressors, few moving parts, strong reliability, with a solid design and stable operation.

4.Widely adaptable to various sites: flexible settings to match various site layouts.

5.Environmentally friendly: Adopt natural refrigerants CO2 (R744) and NH3 (R717), practice environmental protection concept.

 

CO2 Gas Recovery Plant

 

 

 

What can NEWTEK offer you

 

Lowest energy consumption

Highest quality

One-stop service

 

Customized on demand

 

 

FAQ

 

1.Can it be customized according to different production scales?
Yes. We have a high degree of customization capabilities and can tailor equipment specifications and processing procedures based on your specific production volume, site space, budget and other factors.


2.Can it be deeply connected with the company's existing production line automation system?
Of course. We will understand your needs in advance and customize exclusive automation docking solutions to achieve remote monitoring, automatic adjustment and other functions to ensure that the equipment works seamlessly with the existing production line and improve overall production efficiency.


3.How long is the delivery time?

An efficient logistics and distribution system can deliver within 4 weeks after the contract is signed and the advance payment is received, ensuring that you can quickly put it into use, start the carbon dioxide recovery project, and meet basic production needs.


4.For old factories, are there any solutions for the size and installation method of the equipment?
Of course. Our class adopts modular design and tailors the most convenient installation solution to ensure that the equipment is smoothly in place and operates efficiently.

 

Hot Tags: co2 gas recovery plant, China co2 gas recovery plant manufacturers, suppliers, Cryogenic Nitrogen Generator, Carbon Dioxide Liquefaction Plant, Liquid Co2 Production Plant, air liquide air separation unit, Liquid CO2 Refinery Plant, liquid oxygen plant and liquid nitrogen plant

Send Inquiry
Ready to see our solutions?